Clanard Doby 4015 Woodridge Way Tucker GA 30084 (404) 723-5760 E-mail
Address: cdoby1@gmail.com Summary: · 13 plus
years of experience of cell site installation and commissioning. · 7 plus
years of cell site build from start to turning in the close out packages. ·
Commissioned and integrated Ericsson RBS 2106 and 2206 cabinets. ·
Built Ericsson 2106 and 2206 cabinets. ·
Trained in the Commissioning as well as building Ericsson UMTS
cabinets. ·
Hands on Project management experience ·
Hands on experience with builds, commissioning and integrations
of Nokia Flexi Cabs ·
Trained in the process of doing 2nd and 3rd and 4th
carrier adds to an active 3G environment. ·
Ericsson LTE certified in installation and Integration. ·
Ericsson UMTS certified in installation and Integration. ·
Ericsson Smart Laptop Trained doing 2nd and 3rd and 4th 5th &
6th carrier adds ·
Ericsson Mini Link TN Certified ·
Ericsson SP210 Certified TECHNICAL SKILLS:
Hardware:
Intel based Servers, Cisco Router 1600/2500 /2600 /3600/ 7500
Series), 3COM, Nortel Bay routers, and Hubs (D-link, Intel), Network Printers Software:
Remerdy, TRIS, Newt, Vantive, Ensemble, DAP, HLR, SAM, CELL, DISPATCH, PDS
and Flex R
Plus
Network
Protocols/Tech:
TCP/IP, DHCP, DNS, WINS, IPX/SPX, Net BIOS,
SNMP,HTTP,FTP,SMTP,POP3, DHCP,WINS,PPP,ISDN,T1,T3,FrameRelay,
RAS,ISDN,XDSL,ATM,OC3,OC12,OC48,CSU/DSU, MultiPlexer, VLAN,VOIP, DS0-3
1/00
Optera Metro/Long Haul DWDM Certified 12/00
Certification (SDH TransportNode Interface and OAM&P
Concepts)
1/00
MCSE Certification Knowledge Alliance 03/01
Ciena Core Stream Certified DWDM 6/95
South Carolina State University, Orangeburg, SC 6/05
Tellabs 5500 DACS Certified 6/03
Siemen's BTS/UMTS NodeB Certified 7/05
TruPosition E911 Certified 7/05
FlexMaster Certified 06/10
Ericsson LTE Certified 03/12
Ericsson Mini Link Certified Professional
Experience Ericsson Implementation Manager
AT&T UMTS/LTE
NSB
06/13 - 12/13 · I was
in charge of entire site build to integration to hand off to OPS for on air
approval. · Approved
change orders entered by the ASP for payments · Ordered
scripts for site integrations as well as the RNDCIQ forms · Requested
and worked with the RNDCIQ team to get site configuration based on customer
requested configurations. · Worked
with the customer to determine the best way to build site integrations
scripts · Scheduled
all site builds and integrations once given the NTP for the sites. · Troubleshot
site integration issues to get the site integrated into the AT&T network · Created
ERF/AMF to request and move equipment as needed for sites. · I would
conduct daily meetings to make sure that the customer's integration needs are
on point for my given market. · I
provided the customer with a daily status up date of all sites worked that
day. · I also
created the daily schedule for a team of 5 to 10 integration technicians and
installation technicians. Ericsson LTE/CDMA Construction
Manager Sprint Network
Vision
09/11 - 06/13 · I am in
charge of entire site build to integration · Conducted
site walk with the SP and the tower owner · Scheduled
site installation and site build with the SP. · Created
and approved COR for site build and modifications. · Signed
off on all site redline drawings and changes · Did the
final site punch with the SP to make sure site was defect free. · Ordered
all replacement equipment needed to fix faulty site issues · Made
sure that all site equipment deliveries were made and scheduled · Had
weekly meetings to make sure that all sites were per market standards with
the SP's · Scheduled
all crane and special access requirements as needed · Handled
all budget cost changes and approvals for constructed sites Ericsson UMTS Tiger Team lead
04/11 - 09/11 · I am in
charge of making sure that all market site we visited by tiger team members
to clear all alarms · I made
the schedule for all team members in market · I gave
support to techs that needed support on all site issues. · I made
sure that all schedule sites were visited and troubleshot as requested. · I also
spoke with the customer to report all daily activities and provide updates as
to the status of all sites issued to troubleshoot. · I met
with the tower crew and AT&T on sites that requested a direct visit by me
for special troubleshooting. · I set
up special access as needed for site that needed to be troubleshot. · I made
sure that all Tiger team members were update on all requested documents for
the customer. · I also
handled all new special projects to the market. · I
preformed the VA markets first 3X2 sector configuration on a 3418 and 3518
cabinet. · I also
preformed the markets first 3rd
carrier OBIF configuration. · I also
preformed the markets first split sector add for capacity on in a single sector. UMTS Lead Commissioning and
Integration
07/10 - 3/11 · Assemble
Ericsson UMTS 3418 and 3518 Cabinets · Installed
the basic package and site scripts on the CBU · Called
tested and each sector for proper working conditions · Would
if needed troubleshoot equipment and network issues with the cabinet · Installed
and powered up the RRU's if not already done · Trained
junior techs on the equipment and proper processes. · I would
install and commission the 2nd and 3rd
carriers if required for the site. · Made
changes to the scripts if needed to complete successfully when loading to
equipment. · Verified
that the cabinet was clear of alarms before turning over to the customer. Ericsson LTE Lead
Commissioning
12/09 - 07/10 ·
Assemble Ericsson LTE Outdoor/Indoor Cabinets. ·
Installed the basic package software into the DUL ·
Cabled the RUL units to the DUL ·
Also cabled the SIU to the DUL. ·
I also was in charge of completing the site installation
paperwork and commissioning paperwork as well. ·
Installed the power to the LTE 6201 V2 and made sure all cards
powered up and function properly. ·
Loaded the required site files to the system and made sure that
the site was ready for integration into the network.
Field contractor lead Ericsson
HSPA and UMTS
Commissioning
03/09 - 12/09 ·
Commission Ericsson 3106 and 3206 Outdoor/Indoor Cabinets. ·
Did GSM OM on the RBS and also would support the T1 and the
build of the UMTS cabinets at my assigned sites. ·
Supported the installation of the UMTS cabinet. ·
Would at times load script files to the UMTS cabinet. ·
Changed out CDU's and DTRU's when found to be faulty. ·
Connected and tested the T1's to the OVP ·
Verified that the Hard Lines and the T-1's were connected to the
UMTS cabinets. ·
Connected and commissioned the LMU services to the cabinets ·
Would also change out various UMTS cards such as FU's and RU as
they were found to faulty. · Also
involved in the addition of a 2nd
carrier to an existing 3G network · Also
did the 2nd level troubleshooting on HSPA product from a field stand point. AT&T Disaster Recovery
Project Contractor
Lead
09/08 - 01/09 ·
Commission and made changes to Ericsson RBS and UMTS equipment. ·
Worked with the restoration of the GSM and UMTS network. ·
Replaced and added new DTRU's and RU's to the GSM and UMTS
equipment ·
Swept lines to as well as tested T-1 lines to help in the
recovery process. ·
Reloaded the IDB as well as the CV if found to be corrupted. ·
Also involved in the addition of a 2nd
carrier to an existing 3G network Field lead Ericsson GSM OM and
UMTS
Commissioning
05/08 - 09/08 ·
Commission Ericsson 3106 and 3206 Outdoor/Indoor Cabinets. ·
Did GSM OM on the RBS and also would support the T1 and the
build of the UMTS cabinets at my assigned sites. ·
Supported the installation of the UMTS cabinet. ·
Would at times load script files to the UMTS cabinet. ·
Changed out CDU's and DTRU's when found to be faulty. ·
Connected and tested the T1's to the OVP ·
Verified that the Hard Lines and the T-1's were connected to the
UMTS cabinets. ·
Connected and commissioned the LMU services to the cabinets ·
Would also change out various UMTS cards such as FU's and RU as
they were found to faulty. ·
Also involved in the addition of a 2nd carrier to an existing 3G
network Flexi Installation and
commission
12/07 - 5/08 ·
Assemble Nokia 3G Outdoor/Indoor Cabinets and H frames. ·
Installed the FCOA cabinets ·
Preformed the installation and cabling of RF jumpers to the
cabinet. ·
Loaded all software on new builds. · Commission
Flexi with RIC SCF file upload ·
Installed and loaded the software to the FSMB system modules. ·
Installed FRIA radio modules or the FRIB radio Modules. ·
Insured proper connectivity between the FRIA radio modules and
the FSMB core modules. ·
Integrated site to the RNC to bring up on air for live traffic. ·
Called tested each sector to make sure that it was processing
calls and checked for E911 services and land line calls. Project
Manager
7/07 - 12/07 · Oversaw
bid walk process, Scheduling, Material Planning, Quality, Closeout packages · Oversaw
the construction aspect of site scoping in support of installation process · Final
Statement of Work Supervise and coordinate all aspects of the construction · Process
including Architect and Engineer related activities and site layout
requirements · Coordinated
the daily activities and requirements of all other Company
disciplines related to the build and integrations of the
Truposition LMU into an active system. · Created
the daily work schedules of all technicians involved. · Created
and processed all final packages that were required by the customer. Lead
Ericsson Installation and Commission
Tech
03/07- 7/07
·
Assemble Ericsson 2106 and 2206 Outdoor/Indoor Cabinets. ·
Wire all SMAs cables and Internal Jumper cables · Verify
all Power and ground connections and commercial power installation before
Powering up site. Arranging for Generators if commercial power is not ready
to meet demand. Install RX AIT kits and enable GSM, & UMTS network to
share the same RX signal on 1900 MHZ. ·
Sweep Test All RF Antenna cables and LNA lines with site master
before connecting External Jumpers and weather proofing site. ·
Test T-1 lines with switch and Program time slots and Cross
Connections as per the PCM design layout. · Installation
and commissioning of TruPosition LMU equipment for 911system. ·
Preformed drive test to confirm that the LMU positioning were
correct. ·
Communicate with Switch to build the site in the BSC and MSC. · Commission
and Integrate Ericsson Cabinet with configurations. · This
position was 100% travel Flexi Installation and
commission
11/06 - 3/07 ·
Assemble Nokia 3G Outdoor/Indoor Cabinets and H frames. ·
Installed the FCOA cabinets ·
Preformed the installation and cabling of RF jumpers to the
cabinet. ·
Loaded all software on new builds. · Commission
Flexi with RIC SCF file upload ·
Installed and loaded the software to the FSMB system modules. ·
Installed FRIA radio modules or the FRIB radio Modules. ·
Insured proper connectivity between the FRIA radio modules and
the FSMB core modules. ·
Integrated site to the RNC to bring up on air for live traffic. ·
Called tested each sector to make sure that it was processing
calls and checked for E911 services and land line calls. Ericsson Installation and
Commission
06/06-11/06
·
Assemble Ericsson 2106 and 2206 Outdoor/Indoor Cabinets. ·
Did Swap outs and New Site Builds, I would Install the Ericsson
2106 and 2206 Connect Power from main unit to Purcell Power Cabinets, laying
metal or liquid conduits and Re-sectorize if necessary at the site Location. · Verify
all Power and ground connections and commercial power installation before
Powering up site. Arranging for Generators if commercial power is not ready
to meet demand. Install RX AIT kits and enable TDMA, GSM, & UMTS network
to share the same RX signal on 850 and 1900 MHZ. ·
Sweep Test All RF Antenna cables and LNA lines with Wiltron 331B
site master before connecting External Jumpers and weather proofing site. ·
Test T-1 lines with switch and Program time slots and Cross
Connections as per the PCM design layout. · Installation
and commissioning of TruPosition LMU equipment for 911system. ·
Preformed drive test to confirm that the LMU positioning were
correct. ·
Commission and Integrate Ericsson Cabinet with configurations. ·
This position was 100%
travel. Ericsson
Installation and
Commission
11/05-06/06
·
Assemble Ericsson 2106 and 2206 Outdoor/Indoor Cabinets. ·
Did Swap outs and New Site Builds, I would Install the Ericsson
2106 and 2206 Connect Power from main unit to Purcell Power Cabinets, laying
metal or liquid conduits and Re-sectorize if necessary at the site Location. · Verify
all Power and ground connections and commercial power installation before
Powering up site. Arranging for Generators if commercial power is not ready
to meet demand. Install RX AIT kits and enable TDMA, GSM, & UMTS network
to share the same RX signal on 850 and 1900 MHZ. ·
Sweep Test All RF Antenna cables and LNA lines with Wiltron 331B
site master before connecting External Jumpers and weather proofing site. ·
Test T-1 lines with switch and Program time slots and Cross
Connections as per the PCM design layout. · Installation
and commissioning of TruPosition LMU equipment for 911system. ·
Preformed drive test to confirm that the LMU positioning were
correct. ·
Communicate with Switch to build the site in the BSC and MSC. ·
Commission and Integrate Ericsson Cabinet with configurations. ·
This position was 100%
travel. NOKIA
2G
03/2005 - 10/2005 · Prepare
cell site for NOKIA Ultra site 2G GSM indoor and outdoor BTS
integration. · Site
acceptance for Power DC/AC, alarm, and T-1 BTS equipment · Installation
of Nokia outdoor IBBU 48v cabinet, Hi capacity 24v cabinet. · Installation
of outdoor NUSS cabinets. · Installation
of Radios, Multi-couplers, Duplexers, Hi cap combiners, power module. · Installation
of SMA cables, RF cabinet jumper cables, and batteries for IBBU and NUSS. · Installation
of Ground and Power cables (AC and DC) · Installation
of RF share kits and ABIS cables. · Install
RX AIT kits and enable TDMA, GSM, & UMTS network to share the same RX
signal on 850 and 1900 MHZ · Installation
test and turn-up of Bias-tee units for MHAs. · Commission
and test BTS/IBBU (Time slot test and BCCH carrier test) · Update
BOIA software, FXC software and BB2E software. · Commission
and test NUSS cabinets. · Run all
fuse alarm test, Mains power test and temp test and back-up battery switch
for NUSS and IBBU. Integrate BTS and make test calls and sector hand-off
test, clearing all alarms. · Installation
and commissioning of TruPosition LMU equipment for 911system. · Preformed
drive test to confirm that the LMU positioning were correct. · This
position was 100% travel. Team Lead Siemens Installation
and
Commissioning
11/04 - 03/06 · On-site
integration and commissioning and installation of 2G wireless equipment in a
customer Environment. · Installation
and commissioning of TruPosition LMU equipment for 911system. · Installation
and commissioning of FlexMaster equipment for T1 breakdown. · Hands
on configuration of Siemens 240,240XL, 241 cell
equipment.
· Trained
in the upgrading of BTS equipment at 1900 MHZ and 850 MHZ. · Trained
in doing frequency sweeps on BTS equipment. · Trained
in the live expansion of BTS equipment at both 850 MHZ and 1900 MHZ. · Preformed
drive test to confirm cell site handoff from cell site to cell site. · Preformed
drive test to confirm that the LMU positioning were correct. · Verify
all Power and ground connections and commercial power installation before
Powering up site. Arranging for Generators if commercial power is not ready
to meet demand. · Install
the RX AIT rack and connection for 850 and 1900 RX sharing. · This
position was 100% travel.
Ericsson
RBS
Installation
07/02-11/04
·
Assemble Ericsson RBS 2106, 2206 Outdoor/Indoor Cabinets. ·
Wire all SMAs cables and Internal Jumper cables ·
Did Swap outs and New Site Builds, I would Install the Ericsson
RBS 2106 and 2206 Connect Power from main unit to Purcell Power Cabinets,
laying metal or liquid conduits and Re-sectorize if necessary at the site
Location. · Verify
all Power and ground connections and commercial power installation before
Powering up site. Arranging for Generators if commercial power is not ready
to meet demand. Install RX AIT kits and enable TDMA, GSM, & UMTS network
to share the same RX signal on 850 and 1900 MHZ. ·
Sweep Test All RF Antenna cables and LNA lines with Wiltron 331B
site master before connecting External Jumpers and weather proofing site. ·
Test T-1 lines with switch and Program time slots and Cross
Connections as per the PCM design layout. · Installation
and commissioning of TruPosition LMU equipment for 911system. ·
Preformed drive test to confirm that the LMU positioning were
correct. ·
Communicate with Switch to build the site in the BSC and MSC. ·
Commission and Integrate Ericsson Cabinet configurations. Make
test calls to LAN Lines, Cell Lines and Emergency Numbers, and test GPRS /
SGSN system. ·
Drive Testing site to make sure proper handoff between Site
sectors, Inter BSC and Adjacent BSC/ Neighbors sites. ·
This position was 100% travel.
References Available
upon request |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|